Prev: Opening of Sikang-T..ghai-Tibet Highways (China, PRC)
Next: Opening of Singapore Indoor Stadium

Opening of Singapore Changi Airport Terminal 3 issue of Singapore

  • Colnect-5443-257-Roof-of-Terminal-3.jpg
  • Colnect-5443-258-Plane.jpg
  • Colnect-5443-259-The-Green-Wall.jpg
  • Colnect-5443-260-Exterior-of-Terminal-3.jpg
Short desc: Opening of Singapore Changi Airport Terminal 3

Issuer: Singapore
Date: 1/9/2008
Occasion: Singapore Changi Airport Terminal 3 opening


Consists of 4 stamps: (See stamps as list)

1st d=Roof of Terminal 3
65c d=plane
$1.10 d=The Green Wall
$2 d=Exterior of Terminal 3

All are perf=14.25


Record of changes