Prev: accelerated 5-year plan coal&oil
Next: accelerated 5-year plan livestock

accelerated 5-year plan electrification issue of Russia

  • Colnect-464-201-The-Plan-in-electrification-Farkhad-hydropower-station.jpg
  • Colnect-464-202-The-Plan-in-electrification-Zuyevskaya-power-plant.jpg
  • Colnect-192-943-The-Plan-in-electrification-Farkhad-hydropower-station.jpg
Short desc: accelerated 5-year plan electrification

Issuer: Russia
Date: 10/24/1948
Sort position: 2
Occasion: accelerated 5-year plan electrification


Consists of 3 stamps: (See stamps as list)

30k grn d=Farkhad hydro-electric station
60k scar d=Zuev hydro-electric station
1r car d=Farkhad hydro-electric station

All are perf=12


Record of changes